| 7 |
Jung, S., J. Chae, J. Shin, B. Kim, J. Koo, S. Lee. 2007: A Data-driven Generic Simulation Model for Semiconductor FAB. Proceedings of The Korean Operations Research and Management Science Society, pp. 37-42. |
| 6 |
Lee, M., J. Chae. 2007: Analytical study for the best transporter dispatching rule for an M/G/1 model. Logistics Research (Korea Logistics Society), Korean Journal of Logistics, Vol. 15, No. 2, pp. 1-11. |
| 5 |
Lee, M., J. Chae. 2007: A Heuristic for Vehicle Dispatching for Material Handling System with Multi-Load Transporters. Logistics Research (Korea Logistics Society), Vol.15, No.1, pp. 19-35. |
| 4 |
Kim, B., J. Shin, S. Oh, M. Jung, J. Chae, S. Lee. 2006: Reassignment Based Vehicle Dispatching for a Semiconductor FAB. Proceedings of Korean Institute of Industrial Engineers, pp. 843-850. |
| 3 |
Kim, B., J. Shin, S. Oh, M. Jung, J. Chae, S. Lee. 2006: Reassignment Based Vehicle Dispatching for a Semiconductor FAB. Proceedings of the Korean Operations and Management Science Society, pp. 1156-1163. |
| 2 |
Chae, J. 2004: Memetic Search in Facility Layout Design -Hybrid Genetic Algorithm. Journal of the Korean Institute of Plant Engineering, Vol. 9, No. 2 pp. 25-34. |
| 1 |
Chae, J., D. Lee. 2004: A Modified Simulated Annealing for Onemachine Scheduling Problem. Proceedings of Korean Society of Industrial and Systems Engineering, pp. 34-38. |